Skip to content

Washington DC Structural Framing Contractors

by Steven Hershberger | Nov 9, 2009
While the client pondered floor plan options, we forged ahead with the necessary structural framing. Once the first floor replacement joists were set on the bolstered foundation configuration (see Foundation post),and the subfloor fastened down, we were ready to get to work on thestructure supporting the second floor. Our first task was toconstruct a support system to...

Washington DC Foundation Contractors

by Steven Hershberger | Sep 14, 2009
The most important part of any house is the foundation, which at 753 was in dire need of attention. The existing foundation was a variation of the traditional “pier and beam” model. Typically, a pier and beam foundation incorporates spot concrete footings (dug into the ground below frost level), upon which concrete or wooden piers sit. These in turn hold up support be...

Washington DC Floor Plan and Design Remodel and Renovation Contractors

by Steven Hershberger | Sep 14, 2009
During the design phase,our in-house designers work closely together with each client todevelop a plan that matches their functional and aestheticrequirements. We then produce conceptual and construction drawings andhelp to select specific materials and finishes, while staying withinbudget. This is one of the most important and time consuming portionsof the entire rem...

Washington DC Demolition Contractors

by Steven Hershberger | Aug 26, 2009
With our demolition permit hanging in the window, we were ready to start the dirtiest, but arguably most gratifying phase of the project: Demolition. With a crew of four, we predicted demolition to be complete within ten days. Ambitious? Slightly, but that was our plan. On day one, before the first dumpster rolled in, we knocked the majority of the lathe and plaster o...

Washington DC Salvaging Materials Contractor

by Steven Hershberger | Aug 20, 2009
Four Brothers is a proud member of the U.S. Green Building Council (https://www.usgbc.org/),and we emphasize sustainable green building practices during all our remodeling projects. A component in green building involves salvaging reusable and/or recyclable materials before actual demolition begins, and practicing “deconstruction” whenever possible. (Think of deconstr...

Washington DC Home Remodeling and Renovation Project Overview

by Steven Hershberger | Aug 10, 2009
Just as Rome was not built in a day, a house cannot be rebuilt over night. (Rome also was not destroyed in a day, and houses are not worn out over night, but rather; from years of wear and tear, rowdy residents, and the subtle grind of the natural elements.) The District of Columbia is full of older brick homes such as 753, many built in the late 1800’s and early1900’...

DC Row House Renovation Introduction

by Steven Hershberger | Aug 6, 2009
Recently, Four Brothers began an extensive remodeling project on Fairmont Street in Northwest DC. From the outside, number seven-hundred and fifty-three is a stately, two-story brick row house. Step inside however, and what you’ll find is a jumbled mess (3,200 square feet of it), not to mention a thriving community of rodents. Over the next 12 months, our team has bee...
Cost Guide Graphics FB (3)

Your inbox has never looked so good!

Subscribe to our newsletter and be the first to know when we share new projects! We'll also send you our Remodeling Pricing Guide, with detailed pricing for a variety of projects, to help you plan with confidence.

CONTACT US